Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z More Details for 1965-03-23
Part I of the Critical Design Review of the crew compartment and the docking system in the Block II CM was held at North American. Systems Engineering (SED) and Structures and Mechanics (SMD) divisions, respectively, evaluated the two areas.
- Crew compartment: - The restraint harness, acceptable in the Block I vehicle, interfered with attachments for the suit umbilicals. These attachments were critical for suit ventilation and mobility; the harness location was likewise critical for crew impact tolerances. Evaluation of alternate locations for the harness and umbilical fittings - or both - awaited the availability of a couch mockup. Manned sled tests might be needed to verify any harness changes. - Docking system: - SMD approved the probe and drogue concept, but recommended that fittings be standardized throughout (so that only one tool was needed).
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z © 1997-2017 Mark Wade - Contact © / Conditions for Use |