Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z More Details for 1965-05-10
ASPO Assistant Manager William A. Lee heard a proposal to modify the LEM radar programs to reduce FY 1966 costs by $7 million.
It was his understanding that the proposal would be presented to the Configuration Control Board. Lee said he at first thought the change would be "tolerable," but later felt it was a poor idea. The major points of the proposal were: - Delete landing radars from LEMs 1 and 2: the landing radar was not essential to earth-orbital missions of these two vehicles. In fact, ASPO had planned to drop it on LEM-2 (AS-207) to save weight. Nevertheless the proposal was a violation of the "all-up" concept, and, if adopted, would set a precedent for further deletions. Lee opined that the violations of program ground rules inherent in these changes would establish a dangerous precedent and cut back existing margins too early in the program. It would also, he said, "open the door to a series of 'one-of-a-type' LEMs tailored to their specific development missions. . . . It is too early in the LEM program to consider compromising these requirements, and to do so for budgetary reasons almost certainly will prove to be false economy."
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z © 1997-2017 Mark Wade - Contact © / Conditions for Use |