Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z More Details for 1969-12-06
Afanasyev met with the Chief Designers - Pilyugin, Ryazanskiy, V Kuznetsov, and Chelomei's Deputy, Eydis. Mishin was 'sick' and Chelomei had sent his deputy, as usual, to avoid having to meet Mishin. Afanasyev started with the demand that an Almaz flight take place within less than two years, before the end of the Eighth Five Year Plan. He asked Eydis to install an Igla passive docking system to permit docking with the station of the existing Soyuz 7K-OK as opposed to the planned 7K-S. If Chelomei's bureau could not meet this requirement, then the 'conspirator's' DOS project could be authorised in its place.
An extensive discussion of the future course of the Soviet manned space program followed. Eydis pleaded that the Almaz program not be infringed upon. If an early station was desired, completion of an Almaz could be started on 1 January. The station would not have any military systems or ECS ready, but could be modified for docking with a 7K-OK. He noted that work on Almaz had been underway since 1965, all based on the requirements of the Ministry of Defence. TsUKOS and the General Staff wanted to conduct research in reconnaissance systems - infrared, wide-spectrum, high resolution, and television transmission. Their objectives went far beyond launch of a simple space station. Throughout these discussions Afanasyev did not praise or criticise any of the speakers. Obviously he had to formally discuss the matter with Ustinov before any decision could be made - however this was all theatre. Ustinov had approved the concept in principle in a meeting with the 'conspirators' in October.
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z © 1997-2017 Mark Wade - Contact © / Conditions for Use |