Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Apollo 207
Part of Apollo Lunar Landing
Apollo vs N1-L3
Apollo vs N1-L3
Apollo CSM / LM vs L3 Lunar Complex
Credit: © Mark Wade
Planned Apollo D mission. Two Saturn IB launches would put Apollo CSM and LM into orbit. CSM crew would dock with LM, test it in earth orbit. Cancelled after Apollo 204 fire.

Launched: 1967 August. Number crew: 3 .

Before the Apollo 1 fire, it was planned that McDivitt's crew would conduct the Apollo D mission - a first manned test in earth orbit of the Lunar Module. Separate Saturn IB launches would put Apollo Block II CSM 101 / AS-207 and Lunar Module LM-2 / AS-208 into earth orbit. The crew would then rendezvous and dock with the lunar module and put it through its paces. After the fire, it was decided to launch the mission on a single Saturn V as Apollo 9. CSM-101 instead would be used to accomplish the Apollo C mission that Grissom's crew was to have flown.

When Schirra's Apollo 2 / AS-205 mission was cancelled in November 1966, the booster went to McDivitt's mission, and it was called AS (or Apollo) 205/208, or AS-258 (before Schirra's cancellation, McDivitt's was AS-278, because it used Saturn IB boosters 207 and 208).



People: McDivitt, Stafford, Young, Scott, Cernan, Schweickart. Country: USA. Projects: Apollo.

1967 August - .

Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use