Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Skylab 5
Part of Skylab
Skylab
Skylab
Credit: Manufacturer Image
After completion of the three programmed Skylab flights, NASA considered using the remaining backup Saturn IB and Apollo CSM to fly a fourth manned mission to Skylab. It would have been a short 20 day mission - the CSM systems would not have powered down.

Launched: 1974 April. Number crew: 3 .

Main objective would be to conduct some new scientific experiments and boost Skylab into a higher orbit for later use by the shuttle. The marginal cost of such a mission would have been incredibly low; but NASA was confident that Skylab would stay in orbit until shuttle flights began in 1978 - 1979. But the shuttle was delayed, and faster atmospheric decay than expected resulted in Skylab crashing to earth before the first shuttle mission was flown.


More at: Skylab 5.

People: Lind, Brand, Lenoir. Spacecraft: Apollo CSM.

1974 April - .

Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use