Afanasyev |
Born: 1918-08-30. Died: 2001-05-13.
Afanasyev graduated from the Bauman Moscow Higher Technical University (MTVU) in 1941. During the Second World War he worked as an engineer at an artillery factory in Perm, learning armor design. He became the protégé of Minister of Defense Ustinov and from 1946 worked in the Ministry of Defense, then at the Ministry of Defense Industries. After the death of Stalin and the ascendancy of Khrushchev Ustinov was sideline. Nevertheless from 1957 Afanasyev was elected to ascending political positions, culminating in his 1961 election as Deputy Chairman of the Soviet Ministers of the Russian Republic. In October 1964 Khrushchev was overthrown by Brezhnev and Ustinov was returned to a position of power. Afanasyev was made Minister of General Machine Building in March 1965. He held this position and thereby managed the entire rocket and space industries of the Soviet Union until 1983, when Ustinov retired due to poor health. From 1983-1987 he was Minister of the Heavy and Transport Machine Industry. In 1988 he retired but continued as a consultant to the Ministry of Defense.
Afanasyev Sergei |
Kamanin has his first face-to-face meeting with Korolev in 3 months - the longest delay in three years of working together. Their relationship is at low ebb. Despite having last talked about the next Voskhod flight by the end of November, Korolev now reveals that the spacecraft are still incomplete, and that he has abandoned plans to finish the last two (s/n 8 and 9), since these would overlap with planned Soyuz flights. By the first quarter of 1966 OKB-1 expects to be completing two Soyuz spacecraft per quarter, and by the end of 1966, one per month. Voskhod s/n 5, 6, and 7 will only be completed in January-February 1966. Korolev has decided to delete the artificial gravity experiment from s/n 6 and instead fly this spacecraft with two crew for a 20-day mission. The artificial gravity experiment will be moved to s/n 7. Completion of any of the Voskhods for spacewalks has been given up; future EVA experiments will be conducted from Soyuz spacecraft. Korolev says he has supported VVS leadership of manned spaceflight in conversations with Tyulin, Afanasyev, Pashkov, and Smirnov.
The VVS General Staff reviews a range of documents, authored by Korolev before his death, and supported by ministers Afanasyev and Petrovskiy. The schedules for the projects for flying around and landing on the moon are to be delayed from 1966-1967 to 1968-1969. A range of other space programs will similarly be delayed by 18 to 24 months. An institute for tests of space technology will be established at Chelomei's facility at Reutov. The IMBP will be made the lead organization for space medicine. Responsibility for space technology development will be moved from MOM to 10 other ministries. 100 million roubles have been allocated for the establishment of new research institutes. Kamanin is appalled, but Malinovskiy favours getting rid of the responsibility for these projects. The arguments over these changes - which reduce the VVS role in spaceflight - will be the subject of much of Kamanin's diary over the following weeks.
Decree 'On renaming OKB-1 as TsKBEM and OKB-52 as TsKBM' was issued. In 1966 Afanasyev reorganised the military industrial complex. OKB-1 was redesignated TsKBEM. Sergei Osipovich Opakhin was made First Deputy within the new organization.
However within TsKBEM there were no relative priorities for the projects competing for resources. The R-9 and RT-2 ICBM's, the orbital, circumlunar, and lunar orbiter versions of Soyuz, the LK lunar lander, the N1 booster -- all were 'equal'. It seemed folly to be pursuing the orbital ferry version of the Soyuz when no space station had to be funded. But it was felt flying the spacecraft would solve reliability questions about the design, so it was pursued in parallel with the L1 and L3 versions.
Nikolayev, Bykovsky, Komarov, Khrunov, Gorbatko, Kolodin, and Voronov complete two parachute jumps each, with landing at sea. Training in sea-recovery by helicopter, with the cosmonauts in spacesuits, will be completed over the next two days. Smirnov is ready to sign a letter from Afanasyev, Burnazyan and Keldysh creating a new civilian cosmonaut training centre under the Ministry of Medium Machine Building, separate from the VVS centre. The letter is not coordinated with the Defence Ministry, and contradicts the letter sent by the four marshals to the Central Committee. Kamanin prepares a vigorous refutation of the letter's position. The physicians' board on OKB-1 candidates has only cleared Yeliseyev for flight - they could not agree on Volkov, Kubasov, and Grechko. OKB-1 only submitted four candidates for review, not the eight promised.
A government resolution has created a Council for the Problem of the Conquest of the Moon. The chairman will be Minister Afanasyev; the members, other ministers, deputy ministers, academicians, and the chief designers. The only member from the Defense Ministry will be lieutenant generals Karas and Sokolov. There are no VVS members, but Kamanin has already received a request that General Ioffe report to the council on VVS plans for search and recovery of unmanned lunar precursor spacecraft.
Rudenko has reached agreement with Mishin that L1 and L3 crews will also consist of a VVS pilot as commander, and an OKB-1 flight engineer. Kamanin is depressed. Despite the support six marshals (Malinovskiy, Grechko, Zakharov, Krylov, Vershinin and Rudenko), Mishin has won this argument with the support of Ustinov, Serbin, Smirnov, Pashkov, Keldysh, Afanasyev, and Petrovskiy. Later the State Commission meets, for the first time in a long time at Tyuratam. Kerimov chairs the session, with more than 100 attendees, including Mishin, Rudenko, Krylov, Pravetskiy, Kurushin, Ryazanskiy, Mnatsakanian, and Tkachev. All is certified ready,. Launch of the active spacecraft is set for 26 November, and the passive vehicle on 27 November.
Kamanin views film of the Soyuz SAS failure and subsequent first stage explosion. The film is of little help, being taken from far away and the camera jiggling. Afanasyev arrives in Tyuratam that evening and is domiciled in the house in Area 17 used by Khrushchev and DeGaulle during their stay. Kamanin leaves for Moscow, but ends up having to take the train from Kuibyshev due to sustained poor weather. Meanwhile Afanasyev heads the State Commission at Tyuratam. Mishin bravely confesses that OKB-1's design of the SAS system had fundamental errors in logic. It was found that after power was removed from the SAS during the booster deactivation process, the gyroscopes would slowly rise to the stops of their supports, which in turn would trigger firing of the abort rocket. It had previously been thought there were only three ways to fire the SAS: by command from the flight director, when the flight angle of the rocket dropped below seven degrees, or when the combustion chamber pressure dropped below a specific level. The subsequent fire in the booster was inevitable since the separation of the descent module of Soyuz from the instrument compartment was accomplished by firing 32 squib charges. The commission hears with alarm that a test of the SAS on 11 December at Vladimirovka also started a small fire for about a minute, but it was restricted to the Soyuz instrument module since the dummy third stage was not fuelled. This was considered insignificant at the time, but the failure to report it prior to the launch attempt of 14 December is now seen as a major failure of communications. Mishin's resolve to accept the blame does not last long - he soon tries to blame the engine manufacturer. However Glushko's representative proves that the first stage shut down because of a failed oxygen valve in the Block G strap-on. Normally this could be repaired and the launch reattempted within three days. The reason for the catastrophe was the defective logic of Mishin's SAS system.
Ustinov convened the commission at noon. The work was to be completed by 15 May, and the final report issued by 25 May. The members of the commission would be Ustinov, Smirnov, Serbin, Afanasyev, the Chief Designers, and Gagarin. 22 members would work in seven subcommittees that would:
Afanasyev, Kerimov, and Tyulin object to Kamanin's conclusion that problems exist with the automated landing system and that a manual backup is needed. They want to find fault only with the parachute. The findings of VVS LII, and TsAGI are discussed. Later Kamanin has an unpleasant conversation with Gagarin. He wants to remove control of the manned flight control centre away from the MOM. Kamanin believes this is contrary to the interests of the Ministry of Defence.
The meeting is headed by Afanasyev. The first N1 will have a payload of only 76 tonnes, versus the 95 tonnes required for the L3 lunar landing complex. In order to land two cosmonauts on the moon, as the Americans are planning, a 105 tonne low earth orbit payload would be needed. This would require new engines in the first and second stages. Kuznetsov says that his 153 tonne engine could be uprated to 170 tonnes without any basic changes. Lox/LH2 engines would be needed for the upper stages. Keldysh questions the safety of the current plan of landing only one cosmonaut on the moon. Mishin replies that putting two cosmonauts on the moon simply is not possible with the N1. Chelomei raises a question - How is it possible that the Americans have built he Saturn V, which can put 130 tonnes in low earth orbit, in order to land two men on the moon, and Mishin says he can do the same mission with 105 tonnes? Mishin claims that this is due to the lighter design and construction of the L3. The following decisions are made:
Mishin sends a letter to Afanasyev and Smirnov, proposing to cancel the Kozlov's 7K-VI military version of Soyuz. It is an unnecessary new spacecraft design, he says. As an alternative Mishin proposes to double to 8 to 10 the number of flights of the existing Soyuz design planned for 1968. Kamanin is astounded. Mishin was never opposed to Kozlov's 7K-VI before. No one had ever indicated that the VI had to be a precise copy of the Soyuz. The military is opposed to the move. On another matter, Kamanin sends a letter to Mishin, complaining about the L1 trainer provided - the simulator is not representative of the actual spacecraft. Meanwhile the second test of a Soyuz mock-up is made at the parachute trials at Fedosiya. It proceeds normally, and the test clears the way for an unmanned space flight of the redesigned Soyuz.
Mishin is drunk again at a critical mission phase. Afanasyev, Kerimov, and Tyulin all know about Mishin's drinking problem but do nothing. Meanwhile in orbit Soyuz-B's stellar navigation system has not functioned correctly (it hasn't worked on any Soyuz, Kamanin notes). The decision is made to use the ion orientation system. The TDU braking rocket fires at 10:03 on 2 November. But the spacecraft is not oriented correctly, and the landing will take place 2000 to 3000 km from the recovery area. The APO destruct system determines that the landing point will be 300 to 400 km east of Ulan-Ude, and automatically blows up the capsule during re-entry at an altitude of 60 to 70 km above Irkutsk. This was completely unnecessary, since the capsule would have landed on Soviet territory, or in Mongolian territory close to the border. The orientation problem is found to be due to incorrect functioning of the ion orientation system.
Kamanin attends an Almaz program review with Pashkov, Afanasyev, and Chelomei. The resolution of June 1967 required space trials to begin in 1968, and entry of the system into military service in 1969. But this schedule was flawed from the beginning. The project plan required design, qualification, and delivery of completely new complex systems from ten different ministries. The Ministry of Radio Equipment was to deliver 66 items, but the ministry refused, saying they could handle two at most. Similar responses were received from other ministries. The result is that six months into the program, the first flight schedule has already slid 24 months, to 1970. The VVS has been dealing with Chelomei for two years, and find him much better to work with than Mishin. Chelomei's deputies are highly cultured men, pleasant to work with (unlike Mishin and his circle). The VVS is to handle the following on the Almaz program:
A panel headed by Afanasyev and Mishin reviews the readiness of the N1. The mock-up booster is to complete pad compatibility tests by 30 March 1968. The first launch is still supposed to take place in the second half of 1968. The launch of the American Saturn V in November has reenergized the workers at Tyuratam. Kamanin is impressed - he was less sure of success, knowing all the problems of a project that requires the labour of thousands of persons. Afanasyev then turns to crew selection issues. The original resolution said that a cosmonaut was to be launched by an N1-L3 by April 1968. Mishin says he will be able to make two launches in the second half of 1968. It will take 18 to 24 months to train crews. But to date, Mishin still won't agree to crew selections, despite dozens of contacts and letters from Kamanin to Ustinov and Smirnov. There are still no simulators for the L3. Mishin wants to launch to the moon only engineers from TsKBEM. He is given an ultimatum: either the VVS will leave the space program, requiring Mishin to take over all training and crew responsibilities, or reach an agreement on crew composition in the next few days. Afansyev orders the commission to convene again in two to three days.
Afanasyev holds meetings on the L3 lunar expedition program. Kamanin recites Mishin's failings. Afanasyev replies that he has talked to Ustinov about it, but Ustinov will leave the current management in charge until N1 flight tests begin. If they are unsuccessful, then Mishin alone will have to answer for it. Afansyev also assures Kamanin that although Feoktistov should be allowed to train for a space flight, he and Ustinov will make sure he never flies.
He is shown the Volga and L1 trainers, takes a seat in the trainer, and is given a simulated space flight. At the air base he reviews the aircraft and the TBK-60 altitude chamber. Throughout the tour, Mishin constantly wore a soft expression and used coarse language. Afanasyev was briefed on and recognised problems with development and delivery of the Salyut digital computer needed for the L1 guidance system. But he was not told that cooperation had broken down totally on the L3 simulator development and crew selection.
The 'big' Soviet of Chief Designers meets and the three-launch landing concept developed a month earlier is presented in detail. Pilyugin pointed out that this was a typical contradiction. Mishin had just made a presentation to the expert commission justifying that the one-launch scheme was safe and reliable. Now they wanted to put forward a new scheme because the one-launch scheme was unsafe and unfeasible. Additional Details: here....
Kamanin, Gagarin, Titov, Popovich, Belyayev, and Leonov meet with Marshal Yakabovskiy. They inform him that Mishin is blocking further development of the 7K-VI military manned spacecraft and also trying to kill Chelomei's Almaz military space station. They get nowhere. The Marshal says that while he doesn't understand much about space himself, Ustinov had assured him that Mishin and Afanasyev were taking all measures necessary to correct the necessary material...
It is decided to orient Zond 5 using the earth sensor. This is not as accurate as the star tracker, but it is good enough to ensure the spacecraft can be put on a course that will take it back to earth. However it is not accurate enough to allow a a lifting re-entry with a double skip manoeuvre and landing in the Soviet Union. It means the spacecraft must follow a high-G ballistic re-entry and land in the Indian Ocean. Afanasyev is personally supervising the midcourse orientation and engine burn.
The Zond 5 situation remains the same. The star trackers quit working, and the use of the back-up systems has not been completely successful. However the spacecraft is on course for a ballistic re-entry. At Area 112 Afanasyev heads the State Commission for the N1-L3 first launch. There are problems with the launch complex. The main electrical cable to the launch complex was accidentally bulldozed. The back-up cables were buried only 30 cm from the main line and both were destroyed. The cables were poorly marked. It will take 50 days to repair the damage. This will delay first launch until the second half of November 1968, and the second launch to February 1969. Most likely the first launch cannot take place until next year.
Coordination problems between the ministries in preparation of the Soyuz spacecraft. VVS and MAP have managers assigned for quality control of each system, while MOM (Afanasyev) counterpart staff are disorganised. Yet again conflicts have to be appealed to 'Cardinal' Ustinov.
The State Commission for the first N1 launch, headed by Afanasyev, convenes at Area 12 of Baikonur. All of the Chief Designers and top generals of the VVS are in attendance. Many defects are identified in the review, but there seem to be no show-stoppers. Payload integration with the booster is to begin 13 January and launch by 18 February. Then Baikonur commander General Kurushin drops a bombshell - he declares he is not prepared to attempt to launch this 'unready' rocket. Much argument and discussion ensues. Finally Afanasyev asks that the issues raised be reviewed, in preparation for the next commission meeting on 11 January.
SA Afanasyev considered that one near term solution would be a 2 launch scheme => 2 crew:0 crew). Ryazanskiy mentions the Ye8-4 (otherwise not identified, and states, "It is necessary to rethink the N1-L3 program. The scheme can not be single launch. (LK-R + Ye8-2); 2 launch scheme with docking in lunar orbit".
At Baikonur, Ustinov and Afanasyev get into an argument with Mishin. They want Soyuz 4 and 5 to accomplish a completely automatic docking, as was done successfully by Cosmos 186/188 and Cosmos 212/213. Mishin categorically rejects this. He wants a manual docking, which was unsuccessful when attempted by Beregovoi on Soyuz 2/3. Meanwhile the Soyuz 4/5 crews hold a news conference.
Afanasyev and Keldysh chaired the unusual and extraordinary Soviet of the chief designers. Mishin opened with an emotional plea not to cancel the N1. He justified the delays and failures by saying that he had not been given sufficient budget to conduct necessary experimental and qualification tests of systems before flight. Additional Details: here....
Mishin was staying in Korolev's cottage at the launch centre. The other chief designers were staying at the cosmodrome's hotel, while the technicians and workers were at the new apartments at Area 113. Afanasyev headed the 'Little Soviet', the State Commission, that would oversee the launch. The commission met in the conference hall in the huge horizontal assembly building for the N1 at Area 112. The commission gave the approval, and the first flight-ready N1 was rolled out of its assembly building over the 4 km of track to the launch pad. The huge dimensions of the booster had required a new method of building the booster at the launch site. Simulators were able to check all of he booster functions up to the point of engine ignition.
N-1 serial number 3L was the first N-1 launched. The vehicle ran into trouble immediately at lift-off. A fire developed in the tail compartment. The engine monitoring system detected the fire, but then gave an incorrect signal, shutting down all engines at 68.7 seconds into the flight. British intelligence detected the launch attempt, but the CIA's technical means for some reason missed it and they denied for years that it had ever occurred. In retrospect the launch team at Baikonur pointed to a grave mistake - at the christening of the first N1, the champagne bottle broke against the crawler-transporter rather than the hull of the rocket. After the 3L failure everyone knew there was no chance at all of beating the Americans to the moon. Additional Details: here....
Over two days a State Commission reviewed all of the conclusions of the N1 3L failure investigation and the readiness of N1 5L for flight. All of the fixes identified to remedy the 3L failure had been incorporated into 5L. It was felt that the behaviour of the systems in fire conditions were understood and appropriate measures had been taken. The wiring had been rerouted and insulated. Barmin wanted the system not to shut down any engines under any conditions during the first 15-20 seconds of flight, so that the booster would clear the pad and there would be no risk of the pad's destruction. But there was no time to develop such measures before the 5L launch; it could only be added in vehicle 6L. Additional Details: here....
They are Leonov, Bykovsky, Voronov, Khrunov, Yeliseyev, Makarov, Rukavishnikov, and Patsayev. Mishin expects a landing by the end of 1970; Kamanin thinks this is impossible. Afanasyev and Mishin propose modernisation of the N1, but this will take three to four years, by which time the booster will be essentially obsolete. The second launch of the N1 is set for 3 July. It would be a welcome miracle if it flew, but it still would not be enough to erase the American lead in the moon race.
Two sequential N1 failures could not just be blamed on the poor reliability of the first stage. It was apparent that, compared to the Americans, both the management and the development practices of the Soviet space programme were inferior to the Americans. Politically there was no consensus within the Soviet state of the need for a space programme. Glushko and Ustinov waged a perpetual struggle against Afanasyev, Keldysh, and Mishin. RVSN Commander Kirillov wrote a letter to Smirnov on behalf of Afanasyev on the root causes of the failures. His faction believed these were the continued use of artillery/military rocket development practices for large, complex systems. These outdated practices required 20 to 60 flight tests to achieve reliability before a rocket could be put into production. Additional Details: here....
However the board makes a big fuss over Kamanin having trained only four back-up cosmonauts to support eight prime-crew cosmonauts. A follow-up meeting is held with Smirnov and Afanasyev at 19:15, where Kamanin's training is denounced as a big failure. Nevertheless at 22:00 the word comes from the Kremlin to proceed with the missions. Kamanin points out that simultaneously with this mission he had cosmonauts in training for Soyuz s/n 17, 18, 19, 20 (Kontakt missions) and L1 circumlunar fights. Kuznetsov, Beregovoi, and several other cosmonauts are also enraged with Kamanin for bumping Nikolyaev from the Soyuz 8 crew. Kamanin maintains that in the circumstances he only had enough training resources for 8 prime + 4 back-up crew, especially for a mission scenario that would not be flown again in the future.
Mishin was opposed to the DOS space station concept - he wanted to pursue the N1-launched MKBS. Afanasyev and Deputy Minister Tyulin wouldn't support the idea either. None of them wanted to take the risk. The only chance was to get to VPK Chairman Ustinov through Communist party channels. The opportunity came on the flight of engineers and management to Baikonur for the Soyuz 6/7/8 flight. Feoktistov had prepared a briefing on DOS, which he presented to Ustinov.
Kamanin's 61st birthday begins with a communications session with Soyuz 8. Yells come from the spacecraft. What's wrong? the ground nervously inquires. They reply they are only celebrating the successful closing of the hatch, and the glowing 'SA hermetic' indication on the panel. This ends fears they had all during the flight of not being able to get the hatch closed with the broken wheel spoke. The 145 second long retrofire begins at 11:29. It looks OK on the telemetry, but Shatalov reports on UHF that the indication aboard the spacecraft was that there was a 4 second underburn. Nevertheless the landing proceeds normally, and there is a loud 'Ura!' at the command point once word of a safe crew recovery is received - the mission is completed. Soyuz 8 landed at 09:10 GMT. At 16:40 the teams head back toward Moscow aboard an Il-18. Kamanin discusses the necessity to complete an extra 8 to 10 Soyuz spacecraft. He is supported by Afanasyev and Kerimov, but Mishin and Karas are opposed now. Kamanin thinks it is insane how Soviet space progress is blocked by these kinds of politics.
In the euphoria after the return of the Soyuz 6/7/8 crews, the problem was how to get Ustinov to meet further with the DOS 'conspirators'. Mishin had prohibited any meetings by TsKBEM staff with the Communist Party Secretary unless Mishin was also present. Another obstacle was that Feoktistov was not a party member; how could his presence at a party meeting be explained to Mishin later?
In any event these consideations were simply ignored. Feoktistov was present at a party meeting with Keldysh, Afanasyev, Tyulin, Serbin, and the Ministry of Defence's party cell: Strogonov, Kravtsev, and Popov. Keldysh was mainly worried how the project would affect the N1, but was reassured that the N1 had a dedicated work force, and the L3 lunar lander spacecraft engineers and workers that would work on DOS were currently idle and had no part of that work. It was finally decided to go ahead with the DOS no earlier than January, to allow time for Ministry Decrees, approval of a work plan by the VPK, preparation of a decree for signature by the Central Committee of the Communist Party and the Soviet Ministers. Work began on the project in December 1969 under the initial auspices of the Academy of Sciences. Additional Details: here....
Afanasyev met with the Chief Designers - Pilyugin, Ryazanskiy, V Kuznetsov, and Chelomei's Deputy, Eydis. Mishin was 'sick' and Chelomei had sent his deputy, as usual, to avoid having to meet Mishin. Afanasyev started with the demand that an Almaz flight take place within less than two years, before the end of the Eighth Five Year Plan. He asked Eydis to install an Igla passive docking system to permit docking with the station of the existing Soyuz 7K-OK as opposed to the planned 7K-S. If Chelomei's bureau could not meet this requirement, then the 'conspirator's' DOS project could be authorised in its place. Additional Details: here....
Meeting with Mishin. It is clear that he wanted to continue with the original plan for a dual Soyuz flight in August. It was Afanasyev and Kerimov who were pushing for a single long-duration flight in May. There is no action by the Ministry of Defence to provide rational decision making in regard to manned spaceflight.
Kamanin reviews the Spiral manned spaceplane program with Goreglyad, Frolov, and cosmonaut Titov. Work on the KLA orbiter began in 1961-1962. In the following eight years Kamanin has tried to push the leadership many times to accelerate the project, but without result. Still, the work is proceeding, albeit very slowly. Mikoyan has decided the first phase of the project will use rocket launch only - the air-breathing winged first stage will only be introduced later. Afanasyev has finally responded to the project, only to declare that the KLA must be not only for military missions, but serve as a transport shuttle for civilian space missions as well. Dementiev is holding the whole project up because he doesn't want to overburden the aircraft design bureaux and factories. And Kutakhov won't push the program without Dementiev's support.
Final Landing Commission meeting is held. The primary landing site is 50 km west of Karaganda. Visibility there is 10 km, winds 6-10 m/s. Mishin wants to land 50 km further wesst, near a city with passenger train service. It is finally agreed to land there, at 71 deg 31' E, but that will mean that an emergency ballistic re-entry (in the event of a guidance system failure) would bring the capsule down in the Aral Sea. That in turn means additional recovery forces, consisting of three amphibious vehicles, three helicopters, five naval cutters, and 15 scuba divers have to be alerted and prepared. The Politburo approves the landing, and the plan to fly the cosmonauts to Chkalovsky Airfield, followed by ten days in the hospital. Mishin and Kerimov discussed having the traditional cosmonaut greeting at Vnukovo Airport, but they'll have to forget such extravaganzas in the years to come, when only long-duration missions are planned. Meanwhile the crew is well, preparing for landing. They secure the BO living module, stow items in the SA re-entry vehicle that are to be returned to earth. There is a communications pass at 08:00 to 08:30. Afanasyev, Karas, Chertok, Bushuyev, Tsybin, and other members of the State Commission now arrive at Yevpatoriya.
Kamanin meets with Chelomei. Chelomei discusses his 'war' with Korolev and Mishin. Korolev interfered with, and then finally took the manned lunar flyby project from Chelomei. Now Mishin is doing the same thing with Almaz. Chelomei had already invested five years in development of Almaz, and was on the way to producing a good space station. Then Mishin pushes him out of the way and seizes his production line to build the DOS-7K. DOS#1 is actually Almaz#5, nothing more than a bad copy of Chelomei's station. Serbin and Smirnov do not trust Mishin, which is why they have only authorised him to build four DOS stations. Serbin, Smirnov, and Afanasyev have visited Chelomei, and told him to accelerate work on the Almaz, using three shifts 24 hours a day.
Kamanin notes the second hijacking in Turkey of a Soviet airliner in the last two weeks.
Meeting DF Ustinov (Smirnov, Keldysh Afanasiev, Serbin, Stroganov, Kommissarov, Tsarev, Kerimov and others, on acceleration of N1 after 1973 for MKBS. Meeting at 12:00 - DF Ustinov (Smirnov, Keldysh Afanasiev, Serbin, Stroganov, Kommissarov, Tsarev, Kerimov and others.) ... 2) MKBS - Accelerate after 1973. It is necessary to accelerate the draft resolution on the MKBS and associated activities - EYaRD, reusable transport spacecraft. (Mishin Diaries 2-299)
Kamanin discusses with Kutakhov the need for the VVS to back Chelomei rather than Mishin. As for the Spiral, the support of Dementiev, Afanasyev, Kalmykov, and Zverev have been lined up for the program. But Grechko is still blocking it. And Kutakhov is unwilling to challenge Grechko on the issue.
An expert commission met to consider the N1-L3. Keldysh made several categorical demands:
Further meetings with Mishin's section leaders on 15 and 23 July leading up to a meeting of the N1-L3 Expert Commission with SA Afanasiev on 25 July where the N1-L3 is finally killed.. It is agreed that it could never have landed a cosmonaut on the moon:
1. Agree that the N1-L3 could not land a cosmonaut.
2. LOK, LK - cancelled.
3. N-1 to be used for MKBS, Mars 75, 77, etc.
4. Lunar Expedition - proceed. (but the solution is not clear. Machines may be better.)
5. Costs for N1-L3 to 1 January 1971: 2.9 billion rubles. Required to complete - 3.0 billion.
6. Unreliability must be solved through reliability testing.
7. Extend the use of N1 (LKI, Mars-75, Mars-77, MKBS).
8. What you need to alter under based on this testing.
9. Proceed with development of hydrogen stages, but you need to use the existing stages for now. (Mishin Diaries 2-336) l
Chertok, Bezverby VK - Discussed the docking systems for heavy modules (MKBS). The draft decree for the station, however, is stuck in reviews by the leadership: "Called Afanasyev- Status of the draft decree on MKBS (lies with Rabinovich). The draft decree on development of greater power (the letter is with Slavsky EP). (Mishin Diaries 2-346)
A technical meeting considers "the work plan for L3M and the use of the N-1 LV for other tasks of space exploration (MKBS, stationary satellite, Mars-75). " There is a meeting with SA Afanasiev the next day on the draft decision of the VPK on MOK ("MKBS, not MOK", corrects Tyulin!). And on the following day the extent of the work ahead is laid out:
Organize a group for the study of systems specifications for MOK.
a) For the transport system Earth - Orbit - Earth.
b) For the interorbital tug - stationary orbit and others.
c) For the control systems for MKBS and future systems.
g) For the new reentry vehicle with L/D = 0.6.
d) For the coolant systems.
e) For the SEP (need in stages).
g) For the micrometeorite protection.
h) For the radiation protection.
i) For the pressurization systems, etc.
The State Commission was held to verify readiness of N1 7L for launch. Mishin was 'sick' the whole week of the hearings and had to be represented by his deputies. However neither Mishin or his first deputy Okhapkin were available - both were in the hospital. The commission nearly ruled that until Mishin was available, no launch could be approved. However the review continued. Additional Details: here....
Review materials sent from Moscow.
1. Long-term program TSKBEM (projected) (See. Ref. 4/4748 dated 10 October 1973 from MOM).
MKBS-1 on UR-500K (this would later be Mir)-
Number 1 - 1977
Number 2 - 1978 - 79
MKBS on N-1 - Number 1 - 1983
Number 2 - 1988
N-11 (this refers to the use of the N-11 to replace the UR-500K for boosting modules to MKBS-1/Mir)
1 - 1978
2 - 1979
MKTS on the basis of the first-stage N1 - 1985 with the augmented engine - 1988-90 (this is a reference to the aerospike / air-augmented N1 with the spaceplane second stage, as revealed to USAF agent Peter X in that year!)
Performance in accordance with the "additional materials to the plan for experimental work in 1976-1990. See ref. 10414 dated 6.XII.1973.
2. TSKBEM work plan for 1974.
- Clarify:
a) The number for transport spacecraft to object "A", S.A. (Afanasiev?)
b) The number of DM (ZEM cannot produce the quantity.)
- No specification from TSNIIMMASH for the heavy launch vehicle (not to mention its scientific and technical justification).
3. Thematic plan for experimental work for TsKBEM in 1974.
4. NIR
All these materials require serious revision. (Focused, real and concrete, etc.) -Need to reduce the subject areas, the scope of work and remove excessive detail.
Call Bezverby VK - For papers on MOK.
Received in response via telegram a runaround (old papers are in the materials of the Academic Council). And I need - new papers. (I do not have - or have not yet found - my copies of these papers)
To do:
1. Now, when considering our long-term program and the use of near-earth space (including the Moon) for different purposes, it is necessary to clearly define the sequence of its implementation.
Especially decide - where to start? (Especially in the present situation).
- It is necessary as soon as possible to show the rationality inherent in the program guidelines.
Namely a space-based MOK.
- Optimal location for OAA systems: based on MKBS (DOS) - or visited the MPM for routine maintenance or brought near-MKBS for the same purpose.
- Reusable transport ship based on the 7M, and then a reusable transport system based on the work on the N-1 (but with a new engine system in stage 1).
02.I.1973
- Space problems solved by the OAA.
- A great resource. (even after these events)
Where to start?
? (7KS)
1. DOS 5 (6?) + 7KT + 7KTT + 7KS-OR
7KS-OR (evidently a reconnaissance version of the 7KS) - view as the embodiment of the most efficient use of the developed equipment (Zenit-Yantar)
Negotiations with DI Kozlov (What does he want?)
2. All that in the first only on the basis of the 7M, to create the MTK and MPM (talks with EV Shabarov)
What will branch NII-4 handle?
1. Operative follow-up exploration.
2. Armed struggle in outer space.
(03.I.1974)
3. The defeat of the moving targets.
4. Electronic countermeasures
5. Use of stationary orbit.
6. Use of of sun-synchronous orbits.
Means:
Filial of NII-4 GUKOS support (but only at the lower levels): 1. R-7M; 2. N-1?; 3. N-11
Support in the MO MO for the N-1 - signed by Alekseev and Tolubko.
Navy is indifferent to MOK (they do not understand the prospects)
It is necessary to establish a relationship with the customer. He is interested in this (Attract DI Kozlov!)
(4.I.1974)
- Write a detailed letter on MOK to Afanasyev (copied to the Central Committee) (With a draft work order)
- Draft a memo to the Central Committee for DF Ustinov. (Long-term planning)
- Achieve color television for the Soyuz-M (NN Detinov - CC)
- TsKBEM review of the level of work on special equipment in related organizations.
- Write a memo about the possibilities of "A" in the operational intelligence. (VK Bezverby together with TsNIIMASH).
- Deal with the radio channel on the "Yantar". Orders: VK Bezverby
- The draft memo on the need of long-term integrated planning by the state. TSKBEM work on MOK - 1st to attempt its development. (Mishin Diaries 3-167)
21. Form a unit in TsKBEM for special equipment (e.g. classified military) (for some complexes).
22. Develop ideas on the feasibility of developing and creating two-stage rocket for launch into low earth orbit. (Comparison with 3-stage rocket, the advantages and disadvantages).
23. Conduct a study on the feasibility of establishing MKTS based on two-stage rocket.
24. Conduct research on performance 2-stage rocket for launch of payloads to earth orbit using different fuel components (Including solid propellant).
25. Elaborate design for a surveillance module based on MKBS-1 derived from the N-110.
26. Review a 2-stage N-1 for MKBS-II, a 3-stage for moving heavy SM modules to geostationary orbit and lunar orbits.
Questions for SA Afanasyev
1. His attitude to R-7M. Who is going to build it?
2. His attitude towards the N-11. 2-stage for moving spacecraft to sun-synchronous orbit).
3. On the sequence of launches of DOS and "Almaz".
4. On the development work on MOK.
About MOK - based on our promising developments. Basis MOK - space-based, and it should be checked already on the DOS-5 having two connecting nodes.
5. On the shuttle on the basis of R-7M. (Mishin Diaries 3-176)