Ryazanskiy |
Born: 1909-04-05. Died: 1987-08-07.
Rudenko has reached agreement with Mishin that L1 and L3 crews will also consist of a VVS pilot as commander, and an OKB-1 flight engineer. Kamanin is depressed. Despite the support six marshals (Malinovskiy, Grechko, Zakharov, Krylov, Vershinin and Rudenko), Mishin has won this argument with the support of Ustinov, Serbin, Smirnov, Pashkov, Keldysh, Afanasyev, and Petrovskiy. Later the State Commission meets, for the first time in a long time at Tyuratam. Kerimov chairs the session, with more than 100 attendees, including Mishin, Rudenko, Krylov, Pravetskiy, Kurushin, Ryazanskiy, Mnatsakanian, and Tkachev. All is certified ready,. Launch of the active spacecraft is set for 26 November, and the passive vehicle on 27 November.
Mishin, Chelomei and Barmin report that the spacecraft, booster, and launch facilities are ready. The first unmanned launch of the L1 is set for the end of January, with the arrival of the members of state commission at Tyuratam on 10-12 January.
The commission then considers reports on improvements needed for command, control, and recovery of manned lunar spacecraft. General Spitsa and Chief Designer Ryazanskiy list needed improvements to tracking and communications stations. These will cost more than 100 million roubles, including 50 million to equipment tracking ships. Tracking stations at Yevpatoria and Ussuriysk will require extensive new equipment for control of lunar spacecraft. Officers from TsNII-30 report on enhancements required for search and recovery forces. Due to the worldwide requirement, this can no longer be handled by the VVS alone - naval, long-range aviation, and communications forces need to be involved. Returning lunar ships will be targeted for landing on Soviet territory, but there is a great probability in the event of guidance problems of a splashdown in the Indian Ocean or a landing in Iran, Pakistan, or India. The VVS only has very limited capability for sea search and rescue. On 21 December Marshal Zakharov split manned spacecraft recovery responsibility between the VVS and VMF. To enable search and recovery of spacecraft at sea or on land outside of Soviet territory will require 12,000 to 15,000 personnel and dozens of ships, aircraft, and helicopters. A new net of ground-based radio stations and direction finders will also be needed. This will cost hundreds of millions of roubles to implement. The cost must be borne - it is clearly unacceptable that a Soviet crew fly to the moon and back, only to perish on return to earth due to inadequate recovery forces. A special subcommittee under Marshal Rudenko is named to handle the matter. Kamanin reports on training plans for lunar spacecraft. Crew training will have to begin in January 1967 for crews to complete the five-month syllabus in time for the planned flight dates. L1 commanders must be pilots with prior spaceflight experience. The second cosmonaut need not have flown before. Training of L1 and 7K-LOK crews must be carried out in parallel and separately in order to meet schedules. Mishin, the Ministry of Public Health, and Kamanin should name the crews for thee flights within five days in order to make schedule.
Chertok compared the "Kontakt" and "Liga" systems, and noted that the "Liga" elements in the control loop control system simplified LK landing. MS Ryazanskiy noted that this contradicted a decision two years ago to have the LK make an autonomous landing on the moon (LK homing on and landing near a beacon was postponed at that time). But AS Mnatsanakyan supported the approach, saying it was necessary to speed up the development of the "Liga"; it provided a precision landing on the moon within 50 to 100 m of the target. (Mishin Diaries 2-120).
SA Afanasyev considered that one near term solution would be a 2 launch scheme => 2 crew:0 crew). Ryazanskiy mentions the Ye8-4 (otherwise not identified, and states, "It is necessary to rethink the N1-L3 program. The scheme can not be single launch. (LK-R + Ye8-2); 2 launch scheme with docking in lunar orbit".
In the post-mortems on the N1 after the Apollo 8 mission, MKBS became a key justification for continuing with the N1. MS Ryazanskiy: Our biggest problem - we think only 2 - 3 years ahead. Are we no longer prepared to create a TOS Heavy orbital station? After 7K-VI need to create a large space stations.
VI Shcheulov: Creation of a powerful space station on the basis of N1 would offset, to to some extent, the effect of the United States winning the moon race. MKBS would achieve long-duration through rotation of crews. Modification is necessary in parallel with the existing launch vehicle. We must build two new launch facilities allowing simultaneous launches. (It is necessary to assign the task to develop those launch facilities.) Mishin Diaries 2-159)
Afanasyev met with the Chief Designers - Pilyugin, Ryazanskiy, V Kuznetsov, and Chelomei's Deputy, Eydis. Mishin was 'sick' and Chelomei had sent his deputy, as usual, to avoid having to meet Mishin. Afanasyev started with the demand that an Almaz flight take place within less than two years, before the end of the Eighth Five Year Plan. He asked Eydis to install an Igla passive docking system to permit docking with the station of the existing Soyuz 7K-OK as opposed to the planned 7K-S. If Chelomei's bureau could not meet this requirement, then the 'conspirator's' DOS project could be authorised in its place. Additional Details: here....
All is normal aboard Soyuz 9, except that one of the local telemetry commutators in Ryazanskiy's system has failed. The telemetry data involved is not critical to the flight, and Mishin and Ryazanskiy allow the flight to continue. Mishin is considering extending the flight to 19 or 20 days. To do this the crew will have to stretch their rations. Kamanin finds himself out of the decision loop, 'as usual'. The landing commission wants to complete the flight as scheduled on the 287th orbit.